Home
FAQs about the
Hilton Boost Overlay
How to install and
calibrate the Overlay
Testimonials
20+ HIGH Boost COBRA Overlay
ORDER COBRA
16# Overlay
ORDER LIGHTNING Overlay
SVT Tach Transfer
   
How to install and callibrate the overlay
The Hilton Boost Overlay was designed to be installed by the novice and professional alike. When the detailed instructions are followed it should take an average of 1 to 2 hours to install and calibrate. Detailed instructions with photos are supplied with the overlay. The instructions that come with the Boost Overlay are much more in depth but here are the basic steps just to give an overall idea of what is involved.


Step #1

Removal of the gauge cluster.

small overlay installed.jpg
Cobra Overlay

  lightning-cluster.jpg
Lightning Overlay

Step #2

Modify the stock needle and install overlay.

Cobra Needle
 
Lightning Needle

Step #3

Calibration and reinstallation of the gauge cluster.

small calibration rear view.jpg


 
   
All content on this web site is copyright © Hilton Graphics
Developed and hosted by Groen Computer Solutions, LLC